Gisborne Waste Water Treatment Plant
Hamilton
Project Description
Gisborne Waste Water Treatment Plant
Installation of five pump stations, together with gravity sewer and rising main pipework up to 700mm in diameter.
Two layers of wellpoints were required on most pump stations, to a depth of 6-8 metres with the water table at times of 1 metre below the surface.

Technical Overview
Pump stations were installed up to 8 metres deep adjacent to significant buildings which required shoring and dewatering.
Gisborne District Council
Contract Value:
Year: 2010
Location: Gisborne