Tauranga Harbour Outfall
Tauranga
Construct a sheet pile coffer dam to enable a concrete outfall structure, designed to accommodate three DN1800 stormwater pipes, to be built.
Tauranga City Council
Contract Value: $125000
Year: 2014
Location: Port of Tauranga
Port of Tauranga - Pipe Jack
Hamilton
Construct a sheetpile pit for a pipe jacking plant. The pipe jacking operation pushed three DN1950 concrete pipes 30 metres under three railway lines.
Tauranga City Council
Contract Value: $100000
Year: 2014
Location: Port of Tauranga
Madills Farm (Flood Mitigation)
Auckland
Installation of a 550m long, 2.9m x 1.9m concrete box culvert pipeline to upgrade an existing storm water pipeline.
Auckland City Council
Contract Value:
Year: 2016
Location: Auckland
Mangere Wastewater Plant (Upgrade)
Auckland
Three pipelines, one kilometre long, connecting the plant extension with the existing wastewater treatment facility.
Watercare
Contract Value:
Year: 2016
Location: Auckland
Gisborne Waste Water Treatment Plant
North Island
Installation of five pump stations, together with gravity sewer and rising main pipework up to 700mm in diameter.
Gisborne District Council
Contract Value:
Year: 2010
Location: Gisborne
Port of Tauranga (Maui Street S/W)
Tauranga
Installation of a 500 metre long triple 1.8m diameter concrete pipeline taking stormwater from the Mount Maunganui industrial area through the Port of Tauranga.
Port of Tauranga
Contract Value:
Year: 2014
Location: Tauranga