Phone:  07 958 3408
Fax:  07 958 3409

 
 
 
Aircraft movements
 
Box culvert installation
 
Cleaning out casing with augers
 
Dewatered and sheetpiled box
 
Drainage shields for hire
 
Durham Estate
 
Durham Estate
 
Excavation for storage tanks
 
Fiberglass Pump Station
 
Fibreglass Pump Station - Gisborne
 
Fuel installation
 
Jetting piles
 
Jetting tube
 
Lay 1200mm diameter pipes across runway at night
 
Manhole installation in carpark
 
Pipe joint
 
Polyethelene pressure main installation
 
Selwood Silenced Pump
 
Sheetpile for wetwell installation
 
Sheetpiling for Manhole
 
Transition chamber between box culvert and circular pipe
 
Trunk sewer incorporated in box culvert
 
Waler installation
 
River diversion for installation of box culverts
 
 
Air ram thrusting casing
 
Backfilling of culvert
 
Base preparation for storage tanks
 
Headwall installation on pipe outlet
 
Installation - Gisborne
 
Lower Pipework - Good Street
 
Manhole Installation
 
Movax Pile Driver driving sheets
 
Piles in place
 
Recovering wellpoints
 
Selwood 150 Pump
 
Services
 
Shoring for wetwell base
 
8m deep fibreglass pump chamber with concrete ballast
 
Compaction of backfill
 
Crane Truck for delivery
 
Hewletts Road crossing
 
Pile cap ready for pouring
 
Placing basecourse on geogrid
 
Sheetpiled dam
 
Storage Chamber & Pump Station - Good Street
 
Storage tank installation
 
Thrust pit and pipe jack
 
Wetwell base ready for ballast concrete
 
Fibreglass pump station & storage chamber
 
Storage tanks inside sheetpiled & dewatered excavation
 
Aircraft movement on sealed trench
 
Completed box culverts
 
Dewatering for pipelaying
 
Ditchwitch DW40 Pipeburster
 
Filling of revetment mattress
 
Laying Fibreglass Pipe
 
Manhole installation in roadway
 
Pouring of outlet floor
 
Rising main
 
Storage Chamber & Ballast - Good Street
 
Fibreglass Manhole
 
Pump station installed beside Pernod Ricard - Gisborne
 
Tricky installation under existing services
 
Sheetpile excavation
 
Double sheetpile & dewatering installation
 
Night work for system change over
 
Drilling Shaft
 
Boxed Manhole
 
Placing Risers
 
Pressure Main 11
 
Pressure Main 11
 
Pressure Main 11
 
Pressure Main 11
  


Back...