Port of Tauranga - Pipe Jack
Hamilton
Project Description
Port of Tauranga - Pipe Jack
The sheetpile pit was seven metres by ten metres and was made of eight metres clutched interlocking sheets.
The pit was reinforced with 200 x 400 whaler beams and was dewatered using a six inch vacuum pump and a range of dewatering spears.
The pit was constructed to sit a pipe jacking plant inside. The pipe jacking operation pushed three DN1950 concrete pipes 30 metres under three railway lines.
The sheets were driven using a 35 tonne excavator and a Movax sheet piler.
The pit was excavated using a five tonne excavator.
Technical Overview
Construct a sheetpile pit for a pipe jacking plant. The pipe jacking operation pushed three DN1950 concrete pipes 30 metres under three railway lines.