Award Winning Civil Construction

Gisborne Waste Water Treatment Plant

Hamilton

gwwtp-1000.jpg
Innis_Street-1000.jpg

Project Description

Gisborne Waste Water Treatment Plant

Installation of five pump stations, together with gravity sewer and rising main pipework up to 700mm in diameter.

Two layers of wellpoints were required on most pump stations, to a depth of 6-8 metres with the water table at times of 1 metre below the surface.

Technical Overview

Pump stations were installed up to 8 metres deep adjacent to significant buildings which required shoring and dewatering.

Gisborne District Council
Contract Value:
Year: 2010
Location: Gisborne

Project Category