Award Winning Civil Construction

Tauranga Harbour Outfall

Tauranga

Construct a sheet pile coffer dam to enable a concrete outfall structure, designed to accommodate three DN1800 stormwater pipes, to be built.
Tauranga City Council
Contract Value:
Year: 2014
Location: Port of Tauranga

Gisborne Waste Water Treatment Plant

North Island

Installation of five pump stations, together with gravity sewer and rising main pipework up to 700mm in diameter.
Gisborne District Council
Contract Value:
Year: 2010
Location: Gisborne

Tye Park

Tauranga

Installation of two 28 metre by 1.8 metre diametre fibreglass storage tanks in marine silts at the Tauranga Wastewater Storage facility.
Tauranga City Council
Contract Value: Undisclosed
Year: 2011
Location: Tauranga

Project Category


Top